Difference: CCworkPlan (3 vs. 4)

Revision 42015-01-26 - crlb

Line: 1 to 1
 
META TOPICPARENT name="ComputeCanadaCloudProject"
-- ColinLeavettBrown - 2015-01-26

Compute Canada Cloud Project Work Plan

  • Cloud Scheduler
Added:
>
>
    • For all but current users (ATLAS, Belle, CANFAR).
 
    • Propose that all cloud non-interactive access go through HTCondor/CS, all resources dedicated to CS to achieve 90% (see FS below). Need agreement from CC.
    • Interactive through Horizon on dedicated resources.
    • Fairshare scheduling algorithm (2 weeks history).
    • Accounting
    • Assess possibility of ATLAS, CANFAR and Belle all using the same HTCondor/CS system as CC users.
Changed:
<
<
    • Systems to develop new Virtual Machine with latest HTCondor and CS releases. One or more instances to be run on CC East or West.
>
>
    • Systems to develop new Virtual Machine with latest HTCondor and CS releases. One instance to be run on CC East or West.
 
    • CS/HTCondor VM must run with public/external NIC.
    • End user doc for VM preparation, JDL creation, Job submission, general work flow, etc.
    • Achieve 90%+ utilization on cloud:
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback