Tags:
create new tag
view all tags
   
DiscussionTopicForm
Title Telecon tomorrow (Thursday) @ 5 pm Eastern time
Forum ForumGeneral
Topic attachments
I Attachment History Action Size Date Who Comment
Unknown file formatm4v ALTAIRDropTest2WithTestSparsCorrRigging2Dec19at145pm.m4v r1 manage 35026.9 K 2019-12-04 - 22:52 UnknownUser Second drop test with (nylon+wood) test spars added to the parafoil (and first with rigging un-skewed). ~1:45 pm on Mon. Dec. 2, 2019.
Unknown file formatm4v ALTAIRDropTest3WithTestSparsReverRigging2Dec19at215pm.m4v r1 manage 40747.4 K 2019-12-04 - 22:53 UnknownUser Third drop test with (nylon+wood) test spars added to the parafoil (done with rigging un-skewed, but reversed). ~2:15 pm on Mon. Dec. 2, 2019.
Unknown file formatm4v ALTAIRFirstDropTestWithTestSparsSun1Dec19at3pm.m4v r1 manage 21170.8 K 2019-12-04 - 22:51 UnknownUser First drop test with (nylon+wood) test spars added to the parafoil. ~3 pm on Sun. Dec. 1. The rigging setup was slightly skewed in this drop test.
JPEGJPG ALTAIRParafoilNahidTailoringBeltLoops.JPG r1 manage 2660.1 K 2019-12-04 - 22:57 UnknownUser "Belt loops" and "end stops" sewn on to the parafoil (by Nahid Tailoring Services here in Victoria) for addition of spars to the parafoil. Test spars (nylon & wood) inserted in this photo.
JPEGJPG ALTAIRParafoilNahidTailoringBeltLoopsDetail.JPG r1 manage 2479.9 K 2019-12-04 - 22:59 UnknownUser Detail of "belt loops" sewn on to the parafoil (by Nahid Tailoring Services here in Victoria) for addition of spars to the parafoil.
Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | View topic | More topic actions
Topic revision: r2 - 2019-12-05 - jalbert
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback