Discussion Forum » General »

Progress report, but no telecon today

DiscussionTopicForm
Title Progress report, but no telecon today
Forum ForumGeneral
Topic attachments
I Attachment History Action Size Date Who Comment
Quicktime movieMOV ALTAIRDropTest1WithRealSpars15Dec19.MOV r1 manage 2849.6 K 2019-12-19 - 16:21 UnknownUser First drop test with a real fiberglass spar installed (Sun. Dec. 15, 2019).
Quicktime movieMOV ALTAIRDropTest2WithRealSpars15Dec19.MOV r1 manage 3386.6 K 2019-12-19 - 16:22 UnknownUser Second drop test with a real fiberglass spar installed (Sun. Dec. 15, 2019).
JPEGJPG ALTAIRParafoilWithRealSpars.JPG r1 manage 3160.6 K 2019-12-19 - 16:18 UnknownUser The "real" fiberglass spars from McMaster-Carr on top of the parafoil (with the two nylon end extensions)
JPEGJPG ALTAIRParafoilWithRealSparsCrossed.JPG r1 manage 3204.0 K 2019-12-19 - 16:24 UnknownUser Fiberglass spars crossed onto the parafoil.
JPEGJPG ALTAIRParafoilWithRealSparsFullCrossed.JPG r1 manage 2866.5 K 2019-12-19 - 16:24 UnknownUser Fiberglass spars crossed, and braced over the vents, onto the parafoil.
JPEGJPG ALTAIRParafoilWithRealSparsInstalled.JPG r1 manage 2982.7 K 2019-12-19 - 16:19 UnknownUser A "real" fiberglass spar (with its two nylon end extensions) installed in the parafoil.
Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | More topic actions...
Topic revision: r1 - 2019-12-19 - jalbert
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback